View panel 8. Knarhaven
Long ring dike
The ring dike of Eastern Flevoland is about 90 kilometres long. The ring dike was constructed in separate sections, called dike sections or plots. Each plot was about seven kilometres long. The plots were built towards each other so that the dike finally closed completely. The last hole was closed on 13 September 1956, after some 75 million cubic metres of soil had been worked into the long ring dyke.
Working island Lelystad
One of the dike sections is Plot P, which was located where the municipality now ...
Long ring dike
The ring dike of Eastern Flevoland is about 90 kilometres long. The ring dike was constructed in separate sections, called dike sections or plots. Each plot was about seven kilometres long. The plots were built towards each other so that the dike finally closed completely. The last hole was closed on 13 September 1956, after some 75 million cubic metres of soil had been worked into the long ring dyke.
Working island Lelystad
One of the dike sections is Plot P, which was located where the municipality of Lelystad is now. At the time, this dike section was in the middle of the IJsselmeer. A camp with wooden barracks was built on the dyke section to house engineers and workers of the Dienst der Zuiderzeewerken. Many workmen took their wives and children with them. Later, a second camp of stone buildings was erected. There was also a central kitchen and an infirmary. The camp was later known as Working Island Lelystad and is now part of the Lelystad-Haven district.
Work harbour
Between Plot P and Harderwijk, work was done on Plot S. Part of Plot S was a small working harbour, the Knarhaven, large enough for a few cargo ships to load and unload. You are looking towards that harbour now. The harbour was constructed in early 1953 for the supply of dike materials, such as stones and rowwood. This brushwood, mostly willow, was used to make the braided zinc pieces that were meant to protect the dike from currents and erosion. The work harbour was also used to supply plot P. It was a temporary harbour.
Not completely gone
The Knarhaven was intended to be completely dismantled after the completion of the ring dyke of Eastern Flevoland. The working harbour was filled with sand. However, the Rijksdienst voor de IJsselmeerpolders, which was responsible for designing the IJsselmeerpolders, wanted to preserve the harbour for posterity. After all, the remains of the harbour tell a piece of Flevoland's history. In 1985, the harbour dams were restored. By adding new planting, the Knarhaven became clearly visible in the landscape.
The Knar
Plots P and S were both part of today's Knardijk, the separation between Eastern and Southern Flevoland. Knardijk owes its name to the Knar, a former shallow in the Zuiderzee. This shallow was about two kilometres long and one kilometre wide. It was rich fishing grounds where shrimp and herring spawned. Now the Knar forest is located here.